:date: 2019-04-13 ======================== Saturday, April 13, 2019 ======================== Tickets waiting for feedback ============================ I started with end-user tests for :ticket:`2953`. Which is a difficult task for me because there is so much to do! The first "accident" happened quickly: I started reviewing some pages of the developer's guide, and I moved :file:`docs/dev/dumpy` to :file:`docs/dev/pyfixtures`. The :class:`lino_xl.lib.tickets.TicketsNeedingFeedback` table is cool! This was what I needed. Notifications (instant messaging) is not a solution when you have a lot of tickets which are not really urgent but wait for feedback. Working through this list is part of triaging. Pushed changes for Presto ========================= I finished and checked in my work on :ref:`presto` (see :doc:`0411`). The :class:`lino_xl.lib.cal.DailyPlanner` table is causing a failure in welfare ATM. I am not yet sure what required_roles this table should have. I think that I will add CalendarReader to the user roles of the welfare usertypes admin and 910. I am not sure whether a Coordinator in Avanti should see this table. The leap year bug ================== Hamza fixed :ticket:`2946`. The fix is confirmed by a failure in :ref:`welfare.specs.households`: Mr Ludwig FRISCH (born 1968-06-01) was indeed 45 (not 46) years old on 2014-05-22.